Series 2 Service Instructions

Series 2: Heelrest Replacement (Bolt on)

Step 1.  Remove the Footstrap bolts and Footstrap.
Step 2.  Replace the Footstrap bolts and Footstrap.

Related Articles

  • Series 3: Metal Clutch Replacement

    For Video Instructions, click here: Replacing the Clutch (Plastic) Step 1- Remove the handle from the handle rests and place the handle in the full forward position as shown.  ...

  • A1/GX: Rail Bumper Replacement

    These rail bumpers help support bottom of the A1/GX Rear Leg. Used on; A1/GX Series Only. To order this part, head to our website: WRPR201 – A1/GX Leg Bumper Set

  • Series 4: Short Tank Assembly Replacement

    Replacing your short tank doesn’t have to be a headache – head on over to our instructions page to check out our resources to help you through.

  • Series 4: S3 to S4 Monitor Upgrade

    Step 1- Remove the handle from the handle rests and place the handle in the full forward position as shown.  Step 2- Stand the WaterRower upright and disconnect the bungee...