S1 Service Instructions

S1: Top Deck Replacement

For Video Instructions, click here: Removing the Top Deck

Step 1- Remove the handle from the handle rests and place the handle in the full forward position as shown.

 

Step 2- Stand the WaterRower upright and disconnect the bungee as shown.

Step 3- Lay the WaterRower down. Remove the Tie Rods and JCB bolts connecting the Top Deck to the tank assembly as shown.

Step 4- Remove the Top Deck assembly as shown, being careful not to dislodge the guide pulleys. You may have to disconnect the Tacho pulley (For Series 3 WaterRower’s). Disconnect the Tacho motor plug (For Series 3 WaterRower’s).
Step 5- Replace the Top Deck as shown.

 

Step 6- Replace the JCB bolts and Tie Rods connecting the Top Deck to the tank assembly as shown. Ensure that the Tie Rod cross dowel slots are aligned with the Tie Rod. You may utilize a screw driver to assist this. For Series 3 WaterRower’s: Before tightening the screw, using a long slender screw driver to lift the Tacho belt onto the Tacho motor pulley and the Tacho clutch pulley.

 

Step 7- Stand the WaterRower upright and connect the Recoil Belt to the bungee as shown.

Related Articles

  • S1: Oilite Bearing Replacement

    Step 1- Remove the Handle from the handle rests and place the handle in the full forward position. Step 2- Stand the WaterRower upright and disconnect the bungee from the...

  • S1: Level Gauge Location

    The Level Gauge sticker on all Series 4 (S4) model WaterRower units, is located on the side of the tank under the tank stopper. The Level Gauge sticker on the...

  • A1/GX: Sensor Modification

    If the machine is not registering stroke rate, but distance and time are registering, there may be an issue with the sensor placement and it may need to be slightly...

  • A1/GX: Seat Carriage Replacement

    Step 1.  Stand the Indo-Row machine up and undo the bungee cord. Step 2.  Using the 5mm Allen Key, undo the 2 back rear leg bolts. Step 3.  Using the...