Series 2 Service Instructions

Series 2: Heelrest Replacement (Bolt on)

Step 1.  Remove the Footstrap bolts and Footstrap.
Step 2.  Replace the Footstrap bolts and Footstrap.

Related Articles

  • M1: Handle Replacement (plastic clutch)

    For Video Instructions, click here: Replacing the Handle Assembly (Plastic – Bolt On)   Step 1- Remove the handle from the handle rests and place it in the full forward...

  • S1: Short Tank Assembly Replacement

    Step 1. Remove the handle from the handle rests and place in the full forward position. Step 2. Stand the WaterRower upright and disconnect the bungee. Step 3. Lay the WaterRower down...

  • Series 4: Dolley Wheel Replacement

    Step 1- Assemble the Dolley Wheel to the rail in the sequence shown.

  • Series 4: Monitor Wire Assembly

    Position the handle forward to the front Forward Riser pulley Carefully remove the Top Deck by removing the Top Deck bolts and upper Tie Rods. Gently lift the Top Deck up...